A 3-layer bitumen felt system replaced the old roof covering. The roof was installed with cut to falls tapered insulation system, designed to improve roof drainage and thermal efficiency of the building, which assists the school with reducing whole life cycle costs. The existing pitched roofing was replaced as underfelt was perished and worn. Furthermore, […]
Read More… from Glenmead Primary School Roof Works
A three-layer bitumen felt system replaced the old roof covering, as well as a cut to falls tapered insulation system, installed to improve roof drainage and thermal efficiency of building- assisting the school with reducing whole life cycle costs. Furthermore, timber facias have been replaced with new UPVC facias and gutters which will reduce the […]
Read More… from Mayfield Primary School Roof Works
Speed of construction was essential to provide education facilities for the rapidly expanding local population. Significant savings were achieved with a reduction in programme time through greater speed of installation over traditional construction. […]
Read More… from Harborne Primary School
The project comprised of 3 parts: BIM solution The use of REVIT software for all disciplines provided an opportunity for effective collaboration with the team throughout and mitigated arising issues as the project progressed. In conjunction with REVIT, the 3D animated software was utilised to convey the essence of the project to the client and […]
Read More… from Moor Hall Primary School
The construction works have been split into two phases: Phase 1 – Phase one works commenced in February 2018 and comprise of the demolition of existing structures, including the existing vacant caretaker’s two storey house and outbuilding, alongside the removal of existing trees and soft landscaping. The creation of a new wider dual access road will […]
Read More… from Washwood Health Academy