The works to the historical site spanned a full range of servicing to both the exterior and interior. The tile roof had to be lifted and reinstated over a breathable membrane together with renewal of flat roofs in between pitched roofs. Careful dismantling of the North Wing 1980’s chimney brickwork down to roof level was also completed.
Further roof works were done through the replacement of existing lead work in the North Wing and Main Hall with new conservation Velux roof and single ply membrane respectively. Furthermore, the existing roof-lights above the Main Hall were removed and replaced with new slim-line double glazed units with automatic electronic opening mechanisms.
Internally, restoration of lincrusta wallpaper reinstatement replicas of the lost frieze panels that had been damaged by condensation and water ingress.
Whilst the North Wing area of the building was vacated for the works, the Main Hall and other areas remained in operation throughout the duration of these works with events, weddings etc. with appropriate segregation/phasing.